Well here we are over half way through canoe season. I still have things completely undone that I thought would be finished by now- including more blogs than this. I understand when someone shows up to float, they aren't hugely concerned about most things other than a pretty day, great scenery, and hanging out with friends and/or family. Well God has taken care of that so I am trying to fill in a few gaps. The retail area is mostly done but the rest of the trailer still needs a few things. The main project I haven't gotten to is the bathroom/changing room facility. Just behind the trailer I hope to be able to put in a two stall bathroom with room to change into dry clothes. On the backside will be a sink, hose connection, and a cold water rinse shower. If this isn't made this year, you can look for it next year. The camping area at the bottom of the hill needs a little work, but won't change a lot. The port a jon will remain down there(you're welcome ladies). I hope to do some more clearing and claiming of the wild areas. There certainly are some excellent campsites now and firewood everywhere due to all of the cutting and clearing I have done.
The time is flying by and it certainly is a good thing that I haven't found the time to get these things done. I have all of you to thank for keeping me busy driving the van up and down the road hauling floaters. It's just about too hot to do some of that stuff anyway so I think fall will be the best time for all that.
The time is flying by and it certainly is a good thing that I haven't found the time to get these things done. I have all of you to thank for keeping me busy driving the van up and down the road hauling floaters. It's just about too hot to do some of that stuff anyway so I think fall will be the best time for all that.